Issue 1First up
Audits that miss the problem
- Why an audit that was done can still miss what the inspector finds
- A four-audit routine for this month
- Free template: the audit pack
60
Inspection reports read for our November 2026 sample
42%
raised audits that missed problems (25 of 60)
40%
raised care plans out of date (24 of 60)
32%
raised medicines records (19 of 60)
ProvisionalOur own figures from a sample of 60 reports, November 2026, pending a second-coder check. They are ours, not the regulators’. Read the research
Every month
Something inspectors often find at small services, explained in plain English, with our own figures and the regulators' figures, sourced and dated.
A short, practical routine you can start this month. No purchase needed.
The matching template from the free Care Admin Toolkit, ready to print or adapt.
Three to five dated news items from CQC, CIW, DHSC, Skills for Care, Social Care Wales or NICE, with links, and why each one matters.
The figures come from our research on recent inspection reports, and the templates from the free Care Admin Toolkit.
Quick check · 3 questions
Three quick questions, about 30 seconds. We’ll point you to the issue of Inspection Notes that fits your service best. Nothing is saved unless you sign up. If you do, we keep your result to point you to the right template.
Question 1 of 3
Any audit: care plans, medicines, infection control, the building.
Our research
We read a sample of recent inspection reports for small services and counted how often each problem came up. These three came top, so they are where Inspection Notes starts. Every issue goes to everyone, whichever is your match.
Audits that miss the problem
Issue 1 · 25 of 60 reports
Care plans that fall out of date
Issue 3 · 24 of 60 reports
Medicines records
Issue 2 · 19 of 60 reports
In the November reports, inspectors often described the same pattern: someone’s needs changed, the care plan and risk assessment were not updated, and the audit did not pick it up, even where monthly reviews were marked as done.
Sign up
One email a month from the Eldradesk team. Free, plain English, and written for small services.
In the meantime, here are our latest posts.
Inspection Notes
Free, once a month